Difference between revisions of "Eurocode Design Guides"

From SteelConstruction.info
 
Line 26: Line 26:
 
*[[Media:SCI_P398.pdf|SCI P398 Joints in Steel Construction: Moment-resisting Joints to Eurocode 3, 2013]]
 
*[[Media:SCI_P398.pdf|SCI P398 Joints in Steel Construction: Moment-resisting Joints to Eurocode 3, 2013]]
 
*[[Media:SCI_P399.pdf|SCI P399 Design of steel portal frame buildings to Eurocode 3, 2015]]
 
*[[Media:SCI_P399.pdf|SCI P399 Design of steel portal frame buildings to Eurocode 3, 2015]]
*[[Media:SCI_P400.pdf|SCI P400 Interim report: Design of portal frames to Eurocode 3: An overview for UK designers, 2013]]
+
*[[Media:SCI_P405.pdf|SCI P405 Minimum degree of shear connection rules for UK construction to Eurocode 4, 2015]]
<br clear=right>
+
<br>
 
 
 
However, when these resources are viewed as a whole and combined with the harmonised Eurocodes, the [[Design_codes_and_standards#National Annexes|
 
However, when these resources are viewed as a whole and combined with the harmonised Eurocodes, the [[Design_codes_and_standards#National Annexes|
 
National Annexes]] and the [[Design_codes_and_standards#NCCI|Non-Conflicting Complimentary Information (NCCIs)]], it seems very daunting when considering where to begin. We would therefore suggest that you should have the following to hand to be able to do a simple ‘[[The Blue Book|Blue Book]] design’ to get you started:
 
National Annexes]] and the [[Design_codes_and_standards#NCCI|Non-Conflicting Complimentary Information (NCCIs)]], it seems very daunting when considering where to begin. We would therefore suggest that you should have the following to hand to be able to do a simple ‘[[The Blue Book|Blue Book]] design’ to get you started:

Revision as of 12:10, 12 March 2019

The steel construction sector has published a comprehensive range of information to assist designers make the transition to the Eurocodes including the following design guides and worked examples:

<yt width="450px" id="9BazCswZrXI" />
An introduction to the Eurocodes

with contributions from:

  • Dr Graham Couchman, CEO, Steel Construction Institute
  • Professor Haig Gulvanessian, Chairman of the ICE
    Eurocode implementation committee


However, when these resources are viewed as a whole and combined with the harmonised Eurocodes, the National Annexes and the Non-Conflicting Complimentary Information (NCCIs), it seems very daunting when considering where to begin. We would therefore suggest that you should have the following to hand to be able to do a simple ‘Blue Book design’ to get you started:

P362 – Concise Eurocodes

  • This guide walks you through the determination of design loads and the checks required to demonstrate that the resistance of your selected section exceeds the design requirements. It draws together EC3, the National Annexes and NCCIs into a ‘this is what you need to’ overview.
  • Appendix A is particularly helpful as it lists out step-by-step procedures for each design check, along with references to relevant clauses in EC3/National Annexes/NCCIs and the appropriate section within the guide for further information

P360 – Stability of Beams and Columns

  • Guidance on effective length to be considered for members without intermediate lateral restraint is not included in EC3
  • Effective length parameters are given in Figure 3.1/Table 3.1 for beams and in Figure 3.2 for cantilevers

Interactive Blue Book/P363 Blue Book to EC3

  • For the interactive Blue Book, make sure that the toggle switch on the bottom left hand corner is set to BS EN 1993-1-1 to display the EC3 section properties and member capacities
  • Only other input required is the C1 factor, which is summarised in Table 6.4 of the Concise Eurocodes


The worked example guides (P364 for open sections and P365 for hollow sections) walk through these and other specific design scenarios in more detail, with appropriate clause references, which the designer may also find helpful.

The information from other guides can then be added once you are confident in the basics of EC3 design or where the content is relevant to the specific project under consideration.