Difference between revisions of "CPD Steel the safe solution"

From SteelConstruction.info
 
(3 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
#In the 2015 revision of the Construction (Design and Management) Regulations, the ‘Construction Health & Safety Plan’ is now termed the ‘Construction Phase Plan’.
 
#In the 2015 revision of the Construction (Design and Management) Regulations, the ‘Construction Health & Safety Plan’ is now termed the ‘Construction Phase Plan’.
 
#BS 5531 ‘Code of practice for safety in erecting structural frames’ has been withdrawn by BSI.
 
#BS 5531 ‘Code of practice for safety in erecting structural frames’ has been withdrawn by BSI.
#The RQSC category FG (Footbridges and sign gantries) has been split into FB (Footbridges), CF (Complex footbridges) and SG (Sign gantries)
+
#The RQSC - Bridgeworks category FG (Footbridges and sign gantries) has been split into FB (Footbridges), CF (Complex footbridges) and SG (Sign gantries)
 +
#The RQSC - Bridgeworks category RF (Bridge refurbishment) has been split into SRF (Site-based bridge refurbishment) and FRF (Factory-based bridge refurbishment)
 +
#The BCSA's web address is now www.bcsa.org.uk
 +
#The BCSA member assessments for buildings are now called [[Fabrication#Register_of_Qualified_Steelwork_Contractors_for_Buildings_.28RQSC_-_Buildings.29|RQSC - Buildings]] and are open to non-BCSA members
 +
#The missing Safe Site Handover Certificate 'weblink' is [[Health_and_safety#Safe_site_handover_certificate|here]]
 +
#The BCSA resigned as a registered member of Safety Schemes in Procurement (SSIP) in Novemeber 2020 and now supports members with the Common Assessment Standard which is the pre-qualification scheme recognised by BuildUK  members, clients and contractors.
 
[[Category:CPD]]
 
[[Category:CPD]]

Latest revision as of 07:52, 14 April 2023

Welcome to the online CPD on Steel the safe solution

Having watched the video, please check your learning and download a CPD certificate

Note:
Since the production of this video in 2012,

  1. The BCSA ‘Member Database App’ is no longer available.
  2. In the 2015 revision of the Construction (Design and Management) Regulations, the ‘Construction Health & Safety Plan’ is now termed the ‘Construction Phase Plan’.
  3. BS 5531 ‘Code of practice for safety in erecting structural frames’ has been withdrawn by BSI.
  4. The RQSC - Bridgeworks category FG (Footbridges and sign gantries) has been split into FB (Footbridges), CF (Complex footbridges) and SG (Sign gantries)
  5. The RQSC - Bridgeworks category RF (Bridge refurbishment) has been split into SRF (Site-based bridge refurbishment) and FRF (Factory-based bridge refurbishment)
  6. The BCSA's web address is now www.bcsa.org.uk
  7. The BCSA member assessments for buildings are now called RQSC - Buildings and are open to non-BCSA members
  8. The missing Safe Site Handover Certificate 'weblink' is here
  9. The BCSA resigned as a registered member of Safety Schemes in Procurement (SSIP) in Novemeber 2020 and now supports members with the Common Assessment Standard which is the pre-qualification scheme recognised by BuildUK members, clients and contractors.