Difference between revisions of "CPD Steel the safe solution"
m |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
#In the 2015 revision of the Construction (Design and Management) Regulations, the ‘Construction Health & Safety Plan’ is now termed the ‘Construction Phase Plan’. | #In the 2015 revision of the Construction (Design and Management) Regulations, the ‘Construction Health & Safety Plan’ is now termed the ‘Construction Phase Plan’. | ||
#BS 5531 ‘Code of practice for safety in erecting structural frames’ has been withdrawn by BSI. | #BS 5531 ‘Code of practice for safety in erecting structural frames’ has been withdrawn by BSI. | ||
− | + | #The RQSC - Bridgeworks category FG (Footbridges and sign gantries) has been split into FB (Footbridges), CF (Complex footbridges) and SG (Sign gantries) | |
+ | #The RQSC - Bridgeworks category RF (Bridge refurbishment) has been split into SRF (Site-based bridge refurbishment) and FRF (Factory-based bridge refurbishment) | ||
+ | #The BCSA's web address is now www.bcsa.org.uk | ||
+ | #The BCSA member assessments for buildings are now called [[Fabrication#Register_of_Qualified_Steelwork_Contractors_for_Buildings_.28RQSC_-_Buildings.29|RQSC - Buildings]] and are open to non-BCSA members | ||
+ | #The missing Safe Site Handover Certificate 'weblink' is [[Health_and_safety#Safe_site_handover_certificate|here]] | ||
+ | #The BCSA resigned as a registered member of Safety Schemes in Procurement (SSIP) in Novemeber 2020 and now supports members with the Common Assessment Standard which is the pre-qualification scheme recognised by BuildUK members, clients and contractors. | ||
[[Category:CPD]] | [[Category:CPD]] |
Latest revision as of 07:52, 14 April 2023
Welcome to the online CPD on Steel the safe solution
Having watched the video, please check your learning and download a CPD certificate
Note:
Since the production of this video in 2012,
- The BCSA ‘Member Database App’ is no longer available.
- In the 2015 revision of the Construction (Design and Management) Regulations, the ‘Construction Health & Safety Plan’ is now termed the ‘Construction Phase Plan’.
- BS 5531 ‘Code of practice for safety in erecting structural frames’ has been withdrawn by BSI.
- The RQSC - Bridgeworks category FG (Footbridges and sign gantries) has been split into FB (Footbridges), CF (Complex footbridges) and SG (Sign gantries)
- The RQSC - Bridgeworks category RF (Bridge refurbishment) has been split into SRF (Site-based bridge refurbishment) and FRF (Factory-based bridge refurbishment)
- The BCSA's web address is now www.bcsa.org.uk
- The BCSA member assessments for buildings are now called RQSC - Buildings and are open to non-BCSA members
- The missing Safe Site Handover Certificate 'weblink' is here
- The BCSA resigned as a registered member of Safety Schemes in Procurement (SSIP) in Novemeber 2020 and now supports members with the Common Assessment Standard which is the pre-qualification scheme recognised by BuildUK members, clients and contractors.