Difference between revisions of "Seventy Wilson, London"

From SteelConstruction.info
(Created page with "==Structural Steel Design Awards 2018 - Merit== {{#image_template:image=File:Seventy_Wilson-1.jpg|align=right|wrap=true|width=400}} A 1980s...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
==[[Structural_steel_design_awards|Structural Steel Design Awards]] 2018 - Merit==
 
==[[Structural_steel_design_awards|Structural Steel Design Awards]] 2018 - Merit==
{{#image_template:image=File:Seventy_Wilson-1.jpg|align=right|wrap=true|width=400}}
+
{{#image_template:image=File:Seventy_Wilson-2.jpg|align=right|wrap=true|width=400}}
 
A 1980s [[Multi-storey_office_buildings|office building]] has been fully refurbished and now benefits from a 25% increase in floor area. The space has been rationalised and two new storeys have been added, all with an efficient [[Design|structural design]] dramatically reducing the [[Life_cycle_assessment_and_embodied_carbon#What_is_embodied_carbon.3F|carbon footprint]].  
 
A 1980s [[Multi-storey_office_buildings|office building]] has been fully refurbished and now benefits from a 25% increase in floor area. The space has been rationalised and two new storeys have been added, all with an efficient [[Design|structural design]] dramatically reducing the [[Life_cycle_assessment_and_embodied_carbon#What_is_embodied_carbon.3F|carbon footprint]].  
  
Line 23: Line 23:
 
The team cleverly added 25% floor area to this 1980s office without needing to strengthen the existing steel structure. The original steelwork, previously encased in concrete, was exposed to make it a statement of the building. This two-storey extension is a fine example of how testing and good engineering can give a steel building new life.
 
The team cleverly added 25% floor area to this 1980s office without needing to strengthen the existing steel structure. The original steelwork, previously encased in concrete, was exposed to make it a statement of the building. This two-storey extension is a fine example of how testing and good engineering can give a steel building new life.
  
[[Category:Case studies Multi-storey office buildings]]
+
[[Category:Case studies - Multi-storey office buildings]]
 
[[Category:SSDA]]
 
[[Category:SSDA]]

Latest revision as of 12:40, 12 March 2019

Structural Steel Design Awards 2018 - Merit

               Seventy Wilson-2.jpg
               

A 1980s office building has been fully refurbished and now benefits from a 25% increase in floor area. The space has been rationalised and two new storeys have been added, all with an efficient structural design dramatically reducing the carbon footprint.

The works involved extending the height of the building from five to seven storeys, building a four-storey addition to one elevation and remodelling the circulation cores to provide more office space and an additional lift.

The exposed steel frame in this modern ‘raw’ building is painted bright red to emphasize and celebrate the structure.

Architect astudio
Structural Engineer Heyne Tillett Steel
Steelwork Contractor TSI Structures Ltd
Main Contractor Willmott Dixon
Client Stanhope

Judges' comment

The team cleverly added 25% floor area to this 1980s office without needing to strengthen the existing steel structure. The original steelwork, previously encased in concrete, was exposed to make it a statement of the building. This two-storey extension is a fine example of how testing and good engineering can give a steel building new life.