Difference between revisions of "Victoria Palace Theatre Refurbishment, London"
(Created page with "==Structural Steel Design Awards 2018 - Merit== {{#image_template:image=File:Victoria_Palace_Theatre_Refurbishment-1.jpg|align=right|wrap=tr...") |
|||
Line 23: | Line 23: | ||
The remodelling of the [[Leisure_buildings#Theatres and auditoria|theatre]] has been extremely challenging, ensuring that it will remain a prominent venue for years to come. The whole team has worked in a truly collaborative manner, that was essential due to the evolving [[Design|design]]. Steelwork was key to dealing with the many logistical [[Construction|construction]] challenges due to limited space and access. | The remodelling of the [[Leisure_buildings#Theatres and auditoria|theatre]] has been extremely challenging, ensuring that it will remain a prominent venue for years to come. The whole team has worked in a truly collaborative manner, that was essential due to the evolving [[Design|design]]. Steelwork was key to dealing with the many logistical [[Construction|construction]] challenges due to limited space and access. | ||
− | [[Category:Case studies | + | [[Category:Case studies - Leisure buildings]] |
[[Category:SSDA]] | [[Category:SSDA]] |
Latest revision as of 12:40, 12 March 2019
Structural Steel Design Awards 2018 - Merit
The Grade II listed Victoria Palace Theatre has been remodelled and refurbished to ensure that it remains a prominent part of London’s West End theatre scene for years to come.
The main objectives were to maximise the potential of the stage and fly tower, extend the back-of-house facilities, improve the comfort of the auditorium to seat 1528 and maximise the amount of front-of-house areas, whilst maintaining the building’s historic features.
The structural works included installing a 6m wide by 26m high extension to the fly tower, extending the east wing, and strengthening works throughout the existing building.
Architect | Aedas Arts Team |
Structural Engineer | Conisbee |
Steelwork Contractor | SDM Fabrication Ltd |
Main Contractor | 8Build Ltd |
Client | Delfont Mackintosh |
Judges' comment
The remodelling of the theatre has been extremely challenging, ensuring that it will remain a prominent venue for years to come. The whole team has worked in a truly collaborative manner, that was essential due to the evolving design. Steelwork was key to dealing with the many logistical construction challenges due to limited space and access.