Difference between revisions of "Sheppey Crossing (Summary)"
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
This 1270m long [[Multi-girder composite bridges|multi-girder steel composite]] viaduct with 19 spans rises to 30m over the River Swale to allow ship passage, yet the sweeping [[Plan curvature in bridges|curved]] low profile deck minimises intrusion into the flat landscape. By using [[Design for steel bridge construction#Fabricating the steelwork|modern fabrication]] facilities and forging a team of the designers, main contractor and steelwork contractor, the high level bridge was fabricated and [[Design for steel bridge construction#Launching|erected]] within programme and budget. Opened in 2006, the Sheppey Crossing provides the first fixed link from mainland Kent to the Isle of Sheppey. | This 1270m long [[Multi-girder composite bridges|multi-girder steel composite]] viaduct with 19 spans rises to 30m over the River Swale to allow ship passage, yet the sweeping [[Plan curvature in bridges|curved]] low profile deck minimises intrusion into the flat landscape. By using [[Design for steel bridge construction#Fabricating the steelwork|modern fabrication]] facilities and forging a team of the designers, main contractor and steelwork contractor, the high level bridge was fabricated and [[Design for steel bridge construction#Launching|erected]] within programme and budget. Opened in 2006, the Sheppey Crossing provides the first fixed link from mainland Kent to the Isle of Sheppey. | ||
− | '''Architect''' | + | {|class="wikitable" width=400 |
− | '''Structural Engineer''' | + | |- |
− | '''Steelwork Contractor''' | + | |'''Architect'''||Yee Associates |
− | '''Main Contractor''' - | + | |- |
− | '''Client''' | + | |'''Structural Engineer'''||Cass Hayward LLP |
+ | |- | ||
+ | |'''Steelwork Contractor'''||Mabey Bridge Ltd. | ||
+ | |- | ||
+ | |'''Main Contractor'''||Carillion | ||
+ | |- | ||
+ | |'''Client'''||Highways Agency & Sheppey Route Ltd. | ||
+ | |} | ||
− | Click [ | + | Click [[Sheppey Crossing|here]] for more details of this project |
{{#image_template:image=File:Sheppey_Crossing_-_Table.png|caption= |align=left|wrap=true|width=300}} | {{#image_template:image=File:Sheppey_Crossing_-_Table.png|caption= |align=left|wrap=true|width=300}} | ||
+ | |||
+ | [[Category:Case studies - Bridges]] |
Latest revision as of 11:59, 12 March 2019
This 1270m long multi-girder steel composite viaduct with 19 spans rises to 30m over the River Swale to allow ship passage, yet the sweeping curved low profile deck minimises intrusion into the flat landscape. By using modern fabrication facilities and forging a team of the designers, main contractor and steelwork contractor, the high level bridge was fabricated and erected within programme and budget. Opened in 2006, the Sheppey Crossing provides the first fixed link from mainland Kent to the Isle of Sheppey.
Architect | Yee Associates |
Structural Engineer | Cass Hayward LLP |
Steelwork Contractor | Mabey Bridge Ltd. |
Main Contractor | Carillion |
Client | Highways Agency & Sheppey Route Ltd. |
Click here for more details of this project