Difference between revisions of "Sheppey Crossing (Summary)"

From SteelConstruction.info
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
This 1270m long [[Multi-girder composite bridges|multi-girder steel composite]] viaduct with 19 spans rises to 30m over the River Swale to allow ship passage, yet the sweeping [[Plan curvature in bridges|curved]] low profile deck minimises intrusion into the flat landscape. By using [[Design for steel bridge construction#Fabricating the steelwork|modern fabrication]] facilities and forging a team of the designers, main contractor and steelwork contractor, the high level bridge was fabricated and [[Design for steel bridge construction#Launching|erected]] within programme and budget. Opened in 2006, the Sheppey Crossing provides the first fixed link from mainland Kent to the Isle of Sheppey.
 
This 1270m long [[Multi-girder composite bridges|multi-girder steel composite]] viaduct with 19 spans rises to 30m over the River Swale to allow ship passage, yet the sweeping [[Plan curvature in bridges|curved]] low profile deck minimises intrusion into the flat landscape. By using [[Design for steel bridge construction#Fabricating the steelwork|modern fabrication]] facilities and forging a team of the designers, main contractor and steelwork contractor, the high level bridge was fabricated and [[Design for steel bridge construction#Launching|erected]] within programme and budget. Opened in 2006, the Sheppey Crossing provides the first fixed link from mainland Kent to the Isle of Sheppey.
  
'''Architect''' - Yee Associates<br>
+
{|class="wikitable"  width=400
'''Structural Engineer''' - Cass Hayward LLP<br>
+
|-
'''Steelwork Contractor''' - Mabey Bridge Ltd.<br>
+
|'''Architect'''||Yee Associates
'''Main Contractor''' - Carillion<br>
+
|-
'''Client''' - Highways Agency & Sheppey Route Ltd.
+
|'''Structural Engineer'''||Cass Hayward LLP
 +
|-
 +
|'''Steelwork Contractor'''||Mabey Bridge Ltd.
 +
|-
 +
|'''Main Contractor'''||Carillion
 +
|-
 +
|'''Client'''||Highways Agency & Sheppey Route Ltd.
 +
|}
 +
 
 +
Click [[Sheppey Crossing|here]] for more details of this project
 
{{#image_template:image=File:Sheppey_Crossing_-_Table.png|caption= |align=left|wrap=true|width=300}}
 
{{#image_template:image=File:Sheppey_Crossing_-_Table.png|caption= |align=left|wrap=true|width=300}}
 +
 +
[[Category:Case studies - Bridges]]

Latest revision as of 11:59, 12 March 2019

               Sheppey Crossing.jpg
               

This 1270m long multi-girder steel composite viaduct with 19 spans rises to 30m over the River Swale to allow ship passage, yet the sweeping curved low profile deck minimises intrusion into the flat landscape. By using modern fabrication facilities and forging a team of the designers, main contractor and steelwork contractor, the high level bridge was fabricated and erected within programme and budget. Opened in 2006, the Sheppey Crossing provides the first fixed link from mainland Kent to the Isle of Sheppey.

Architect Yee Associates
Structural Engineer Cass Hayward LLP
Steelwork Contractor Mabey Bridge Ltd.
Main Contractor Carillion
Client Highways Agency & Sheppey Route Ltd.

Click here for more details of this project

               Sheppey Crossing - Table.png