Swansea Sail Bridge

From SteelConstruction.info
Revision as of 11:57, 24 August 2020 by Chris.dolling@steelconstruction.org (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
               Swansea Sail Bridge.jpg
               

This exciting cable-stayed structure comprises a 140m long steel deck supported by 70mm diameter spiral strand stay cables connected to a 42m high steel mast. Steel was key to the success of the very short programme (concept to completion in 15 months), and the formal clarity and final surface finish. Opened in June 2003 for the inaugural ‘Great West Wales Triathlon’, this bridge has become a popular icon for the region and a destination in its own right as well as an essential link between the Port Tawe Innovation Village and the City Centre.

Architect Wilkinson Eyre Architects
Structural Engineer Flint & Neill Partnership
Steelwork Contractor Rowecord Engineering Ltd.
Main Contractor Balfour Beatty Civil Engineering Ltd.
Client Welsh Development Agency


               Swansea Sail Bridge - Table.png