Please answer the following 10 multiple choice questions, then click 'submit' to check the result. The pass mark for a CPD certificate is 8 out of 10, and you may retake the quiz as many times as you wish, but the questions will vary! Please note that one, two, three or all of the possible answers presented for each question may be right, and to gain a mark for that question all correct answers must be identified.

Good luck

Steel the safe solution

Which one of the following would be beyond the scope of competence to be expected of a typical steelwork contractor?

Erection on a city centre site
Drilling concrete
Using bonding adhesives
Erection on a contoured site

Which three of these steps available to the designer can contribute towards making steel the safe solution?

Use of computers to model the erection sequence
Use of Eurocodes
Use of connection types that are standard wherever possible
Use of off-site prefabrication as far as practicable

When should steel erectors be allowed to climb on to the steelwork?

Never
Any time that an experienced erector decides
Only after a suitable method has been established in advance
Only whilst two safety lanyards are both attached, one to a MEWP and one to the steelwork

What is the commonly used term for a mobile elevating work platform (MEWP)?

Flying carpet
Rubber duck
Cherry picker
Baby boomer

Which are the three main hazards that occur during steel erection?

Moving large heavy components into position
The part-erected structure can be unstable
Erection is done on sites that are difficult to reach
Each project is different

Which of these items are the three important safety objectives that underpin the choice of erection methodology?

Choosing craneage to lift and place the steelwork
Maintaining the stability of the part-erected structure
Reducing the time taken for site operations
Providing safe access to working positions

During frame design which three of the following issues will need resolving that affect the development of the design basis outline method of erection?

The stability concept for the part-erected structure including any requirements for temporary bracing or propping
Experience from any trial erection undertaken
Timing and method of grouting foundation connections
Use of profiled steel sheeting to provide lateral restraint

Which two of the following are the necessary steps in getting a site task done safely?

Reporting back to company head office on progress
Setting out what is involved in the task in hand
Completing each task as quickly as possible to reduce the time at risk
Identifying who is to undertake the task

When erecting a single storey building which is the type of crane that would most generally be used?

Tower crane
Mobile telescopic crane
Crawler crane
Gantry crane

When should fixing of metal decking start?

As soon as possible
As soon as the supporting beams are in place
After the steel frame is aligned and stable
Not until all steelwork is complete and grouted