Please answer the following 10 multiple choice questions, then click 'submit' to check the result. The pass mark for a CPD certificate is 8 out of 10, and you may retake the quiz as many times as you wish, but the questions will vary! Please note that one, two, three or all of the possible answers presented for each question may be right, and to gain a mark for that question all correct answers must be identified.

Good luck

Steel the safe solution

Which one of the following would be beyond the scope of competence to be expected of a typical steelwork contractor?

Erection on a city centre site
Drilling concrete
Using bonding adhesives
Erection on a contoured site

During frame design which three of the following issues will need resolving that affect the development of the design basis outline method of erection?

The stability concept for the part-erected structure including any requirements for temporary bracing or propping
Experience from any trial erection undertaken
Timing and method of grouting foundation connections
Use of profiled steel sheeting to provide lateral restraint

Which of these items are the three important safety objectives that underpin the choice of erection methodology?

Choosing craneage to lift and place the steelwork
Maintaining the stability of the part-erected structure
Reducing the time taken for site operations
Providing safe access to working positions

How can frame designers contribute most effectively to ensuring steelwork is erected safely?

By having a dialogue with those responsible for planning and undertaking the work on site
By a comprehensive series of notes on the drawings issued for construction
By designing to keep the weight of each steel member as low as possible
By specifying that steel erectors should never exit the basket of a MEWP at height

When erecting a single storey building which is the type of crane that would most generally be used?

Tower crane
Mobile telescopic crane
Crawler crane
Gantry crane

What is the commonly used term for a mobile elevating work platform (MEWP)?

Flying carpet
Rubber duck
Cherry picker
Baby boomer

The BCSA has developed industry safe site practice for which three of the following situations?

Erection of multi-storey buildings
Erection of grandstands and stadia
Steel erection in windy conditions
Metal decking and stud welding

Which two of the following are the necessary steps in getting a site task done safely?

Reporting back to company head office on progress
Setting out what is involved in the task in hand
Completing each task as quickly as possible to reduce the time at risk
Identifying who is to undertake the task

When should fixing of metal decking start?

As soon as possible
As soon as the supporting beams are in place
After the steel frame is aligned and stable
Not until all steelwork is complete and grouted

Which of the following is the most important step that contributes towards safe practice?

Providing good canteen facilities on site
Only undertaking work during daylight hours
Ensuring that competent persons are mobilised to undertake the task in hand
Establishing a personal relationship with the site safety officer