Difference between revisions of "Sustainability and steel construction quiz"

From SteelConstruction.info
 
Line 3: Line 3:
 
'''Good luck'''
 
'''Good luck'''
 
{{#psy_quiz:sustainability-and-steel-construction}}
 
{{#psy_quiz:sustainability-and-steel-construction}}
 +
 +
[[Category:CPD]]

Latest revision as of 12:10, 12 March 2019

Please answer the following 10 multiple choice questions, then click 'submit' to check the result. The pass mark for a CPD certificate is 8 out of 10, and you may retake the quiz as many times as you wish, but the questions will vary! Please note that one, two, three or all of the possible answers presented for each question may be right, and to gain a mark for that question all correct answers must be identified.

Good luck

Sustainability and steel construction

Which of these are sustainability credentials of structural steel?

High structural efficiency
Offsite construction
Low waste
Infinitely recyclable

Which of the following common construction materials is NOT 'downcycled' when recovered from demolished buildings?

Timber
Brick
Steel
Concrete

Of these following common construction materials, which has the best end-of-life recycling credentials?

Concrete
Steel
Timber
They are all the same

What is the combined reuse and recycling rate for UK structural steel sections?

69%
79%
89%
99%

In buildings designed to take advantage of thermal mass, what is the optimum depth of concrete upper floor slabs?

50mm
90mm
150mm
200mm

What is the current cost per tonne for UK landfill tax for non-hazardous waste?

£8
£24
£32
£64

Based on the Target Zero findings, what is the approximate cost (in terms of % of capital cost) to achieve a BREEAM ‘Excellent’ rating for a commercial office building?

0.5%
0.8%
1.5%
5%

Under BREEAM 2011, what overall score is required to achieve an ‘Excellent’ rating?

45%
55%
70%
85%

How many different environmental issues are assessed under BREEAM 2011 New construction?

43
49
55
61

When assessing the environmental impact of buildings or construction products, what scope of assessment should be used to obtain the most accurate results?

Cradle to gate
Cradle to grave
Cradle to gate with options
It makes no difference