Difference between revisions of "River Tame Crossing"

From SteelConstruction.info
 
(3 intermediate revisions by the same user not shown)
Line 14: Line 14:
 
|'''Client'''||Network Rail
 
|'''Client'''||Network Rail
 
|}
 
|}
 +
{{#image_template:image=File:River_Tame_Bridge_-_Table.png|caption= |align=left|wrap=true|width=300}}
  
{{#image_template:image=File:River_Tame_Bridge_-_Table.png|caption= |align=left|wrap=true|width=300}}
+
[[Category:Case studies - Bridges]]

Latest revision as of 12:00, 12 March 2019

               River Tame Bridge.jpg
               

The River Tame Crossing comprises a pair of identical half-through girder decks, each carrying two tracks, and was part of the major upgrade of the West Coast Main Line in 2007. The decks replaced an existing 100-year old bridge, and the lightweight nature of steel permitted the existing substructures to be re-used.

Investment in the latest robot welders helped the steelwork contractor to produce the girders more cost effectively, and faster than before, with the confidence that the finished product would be right first time. The robots were used to weld stiffeners on girders and are directly linked to the CAD 3D modelling system.

Structural Engineer Scott Wilson
Steelwork Contractor Mabey Bridge Ltd.
Main Contractor Birse Rail
Client Network Rail