Case study search

Featured case studies

100 Embankment, Salford

The second of two commercial buildings sat on a former railway station podium in Salford is quickly ...

9 Cambridge Avenue

In 2015, as part of SEGRO’s master-planning of their Slough business park, the building at 9 Cambrid...

A1 Peterborough to Blyth

An innovative approach is being used to construct and erect bridges across the A1 between Peterborou...

A14 Cambridge to Huntingdon Improvement Scheme - SSDA 2020 Award

The £1.5 billion scheme to improve the A14 trunk road between Cambridge and Huntingdon required a nu...