Please answer the following 5 multiple choice questions, then click 'submit' to check the result. The pass mark for a CPD certificate is 4 out of 5, and you may retake the quiz as many times as you wish, but the questions will vary! Please note that one, two, three or all of the possible answers presented for each question may be right, and to gain a mark for that question all correct answers must be identified.

Good luck

Getting value from fire engineering for Architects and Engineers

An example was provided of a situation in which a code compliant solution was clearly not safe. This was a building in which compartmentation could have been breached by fire spread across an open courtyard. Based on what you have heard today, which of the following do you think could have done to solve or reduce the problem?

Introduce life safety sprinkler systems
Adjust the lines of the fire compartment walls
Use fire resistant glazing to ensure that separation was maintained across the courtyard.
All of the above

In the Leeds Arena, which of the following aspects were incorporated even though they were not required by Approved Document B

The roof structure was partially protected
Life safety sprinklers were added
Combustible materials were removed from the facade
Additional means of escape were provided

The presentation emphasised the fact that inspection is required to make sure that installation of fire resistant products is done properly. Which of the following statements is/are correct?

Errors in installation are usually obvious and should be apparent to most people
Errors in installation are sometimes very difficult to spot and require proper training and experience
Installation should be restricted to those who can demonstrate the appropriate levels of competence, training and experience to do the job
Where calculation is required to determine the appropriate installation of a fire safety system, this should only be done by a competent person.

Which of the following statements best summarises the philosophy described in the presentation?

A fire strategy created in the design stage can be trusted to be carried through to building completion and use
It is quite possible for the integrity of a building fire strategy to be lost during specification, construction and use
It is essential that the fire strategy be considered throughout the building’s lifetime and that the appropriate expertise and checks and balances are in place
Loss of integrity of a fire strategy is more likely to happen in a fire engineered building compared to a building which uses a prescriptive solution

The presentation raised a number of specific points in the final slides. Which of the following statements do you consider to be consistent with those points?

That the focus of fire safety engineering approaches should always be considered as being the cost saving possible over prescriptive approaches
Fire engineering approaches allow us to consider the cost of fires on sustainability of the built environment.
At all stages of the design, construction and operation process appropriate competency must be applied
For fire engineered approaches to work well, it is necessary to ensure that all relevant fire design, construction and operation decisions have been considered together and have been integrated into a whole by a well organised team.